Model NO.: Plastic Injection Molding ABIS-046
Runner: Cold Runner
Design Software: UG
Installation: Fixed
Certification: TS16949, CE, ISO, FDA
Standard: DME Customized: Customized
Product Shaping Mode: Plastic Injection Molding Ww-045
Mould Base: Lkm, Dme, Hasco etc ; Steel
Hardness: 20-60HRC
Treatment: Pre-Harden, Nitride, Heat Treatment, Quenching
Mould Life: 50K - 1 Million Cycles
Product Design Software: Ug, CAD, PRO-E, Solid Works etc
Quality: ISO9001:2000 Certified
Payment: T/T, Western Union , Money Gram
Trademark: ABIS Mold
Transport Package: Crate/Pallet
Specification: 1000T double injection
Product Process:
1. Mold Design Control
2. Mold Steel Hardness Inspection
3. Mold Electrodes Inspection
4. Mold Core and Cavity Steel Dimension Inspection
5. Mold Pre-Assembly Inspection
6. Mold Trial Report and Samples Inspection
7. Pre-Shipment Final Inspection
8. Export Product Package Inspection
Q:What type of mould tool do I need?
A:Mould tools can be either single cavity (one part at a time) or multi-cavity (2,4, 8 or 16 parts at a time). Single cavity tools are generally used for small quantities, up to 10,000 parts per year whereas multi-cavity tools are for larger quantities. We can look at your projected annual requirements and recommend the
best tooling option for you.
.Q:Ok, I've decided to go ahead with my project. How long will it take to get my parts?
A: It can take 3 to 6 weeks to have the mould tool manufactured depending on the part's complexity, size and the number of impressions/ cavities (single or multiple). After we receive your final approval on the tool preliminary design, you can expect delivery of T1 parts within 3-6 weeks. And during mold building process, mold build Weekly Update will be provided to you every week for your better understanding of the manufacturing progress in our work shop