Mold&Tooling
Mold base: LKM, Cast iron etc
Cavity|Core steel:H13,8407,1.2344 or Customized
Standard: HASCO, DME, PUNCH etc
Mold Treatment: Heat Treatment >HRC45
Lead Time: T1 sample, about 3-10 weeks, according to the mold requirement
Mold Design software: UG, CAD, Solidworks
Payment:T/T, Paypal,40% deposit, 30% upon samples, 30% balance before shipping
Project Procedure
1.RFQ: Send 2D&3D drawings or samples
2.Quotation: Offer quote within 24 hours
3.PO: Project kicks off and releases the final drawing
4.DFM: Provide customer DFM report within 2 days
5.2D&3D Mold Design
6. Purchase mold material,make the time schedule
7.Mold building: Rough machining, Heat treatment, CNC precision machining, EDM, Wire cutting, Polish, Mold fitting, Assembly
8.T1: Mold test video and sampling parameter to you, or on-site mold trial
9. Send T1 Samples to you
10.T2: Second mold trial, recheck the part dimensions
11.T2 samples to you
12.Mold Checking: Water leak test
13.Mold Package: Three-ply free fumigation wooden case
14.Mold shipping: FOB, by sea or by air
15.After-sales services
Please reach me as below if you have any questions, thanks!