Mold|Tooling Details
Shaping Mode: Die casting
Mould material: H13 steel core&45 steel frame
Mould base: LKM, HASCO, DEM etc
Cavity: Single&Multi-cavity
The hardness of steel:46~56HRC
Runner system: Hot Runner|Cold Runner
Quality control:ISO9001, GB/T 19001-2008 certification
Applied software: Pro-E, Solidworks, UG, CAD, etc
Mould check: Water leak
Mould life:500K shots-1000K shots
Lead time:3-5 weeks
Package: Wooden case
Why Choose ABIS
1.Founded in 1996, Cover an area of 10000 sqm Plant; Provide OEM/ODM Service
2.Certified by ISO90001, SGS, CE,UL etc
3.Over 20 years experience in Mold Design&Mold|Tooling making, including parts Production
4.Integrating R&D, QC System & Marketing Sales
5.Onestop Service of Custom mold design from Initial drawing design, Material selection assistance, Mold structure/Mold flow analysis, Trial & mass production to Final mold assembly & shipment.
Project process&Control
1.Quote within 24 hours by engineer team
1)Based on 2D/3D drawing, or sample, Even idea or concept
2)Primary DFM can be offered at the same time if necessary
2.PO details confirmation
with a professional sales team in every detail
3.DFM Report Issued
4.2D & 3D Mold design
5.Mold Building
6.Sample & Mold approval
7.Mold-check & Package & Delivery
8.After service to ensure smoothly run mold
QC Control
1.Mould Design Control: Design a review checklist before submitting it to the customer. We will not start the steel purchasing work until get your written approval on our mold drawing.
2.Incoming quality control: all-steel material and outsourcing standard components will be checked to ensure that they are in accordance with the BOM(QTY and material/components name specified)
3. In-process quality control: all the machining and assembling process is under control, we have QC team to check and supervise the tolerance and processed surface to satisfy the requirements.
4.Final quality control: within 3 days of the completion of the plastic mold, we will have a thorough check for the main size of the molded plastic sample and mold to ensure that the critical or full dimension (if required) is within tolerance.
5.Mould Pre-Shipment Final Inspection: Free-fumigation three-plywood case packing; make sure the mold is conformity to the approved mold drawing. The spare components and easily broken components and the electrode (if required) are packaged, as well as the mold drawing and some certificated.